20/06/2011 by ajax103
CIS renewal at Hertford North
The existing TV style CIS screens on Platforms 1, 2 and 3 are in line to be replaced with similar CIS screens as seen at Bayford, Cuffley, Gordon Hill etc...
Also a additional Summary of Departures CIS screen is intended to be positioned above the door to the waiting room on Platforms 2/3.
This work is scheduled to start in the 3rd week of July and is expected to take about 5 days to complete.
The new Platform CIS screens will be double sided (you can view the information from either side of the screen) and have the ability to show the next two trains from that platform, a clock, what platform it is and any special notices such as engineering works.
Replies
Reply ID 81819
20/06/2011 by Firedupinside
quote:
Originally posted by ajax103
The existing TV style CIS screens on Platforms 1, 2 and 3 are in line to be replaced with similar CIS screens as seen at Bayford, Cuffley, Gordon Hill etc...
Also a additional Summary of Departures CIS screen is intended to be positioned above the door to the waiting room on Platforms 2/3.
This work is scheduled to start in the 3rd week of July and is expected to take about 5 days to complete.
The new Platform CIS screens will be double sided (you can view the information from either side of the screen) and have the ability to show the next two trains from that platform, a clock, what platform it is and any special notices such as engineering works.
Doubt it'll help the trains run on time and signal problems that always seem to occur at Gordon Hill and Drayton Park!
Reply ID 81822
21/06/2011 by Ewoowar
quote:
Originally posted by Firedupinside
quote:
Originally posted by ajax103
The existing TV style CIS screens on Platforms 1, 2 and 3 are in line to be replaced with similar CIS screens as seen at Bayford, Cuffley, Gordon Hill etc...
Also a additional Summary of Departures CIS screen is intended to be positioned above the door to the waiting room on Platforms 2/3.
This work is scheduled to start in the 3rd week of July and is expected to take about 5 days to complete.
The new Platform CIS screens will be double sided (you can view the information from either side of the screen) and have the ability to show the next two trains from that platform, a clock, what platform it is and any special notices such as engineering works.
Doubt it'll help the trains run on time and signal problems that always seem to occur at Gordon Hill and Drayton Park!
Perhaps tht wasn't the intention.
Reply ID 81829
21/06/2011 by ajax103
It's still investment, as to the signal failures - blame the copper fairies who nick the cabling, if it weren't for them then there would be fewer incidents of signals failing.
Reply ID 81832
21/06/2011 by Andrew
This is good news, especially as the clock on platform 1 has been stuck for months now and when it did work conjured up some exotic timings.
Reply ID 81841
22/06/2011 by jez_p
quote:
Originally posted by Andrew
This is good news, especially as the clock on platform 1 has been stuck for months now and when it did work conjured up some exotic timings.
And it is presumably more useful than the ticket barriers - which now seem to be permenantly open.
Reply ID 81843
22/06/2011 by Kate
quote:
Originally posted by jez_p
And it is presumably more useful than the ticket barriers - which now seem to be permenantly open.
They were closed one night recently, possibly Monday.
Reply ID 81844
22/06/2011 by steven
Yes it was Monday, and it was carnage as they (three or four staff?) seemed to refuse to open the overflow gate and check those tickets manually, one of the barriers was temperamental and was permanently manned so they could open it when it stuck, and people were queueing down the stairs.
I hate those gates, and I hate those stupid small doors that seem to turn people into pushing and shoving idiots, especially those too impatient to get in and push past the 50 or so people trying to get out.
Reply ID 81848
22/06/2011 by Kateg28
It was also Tuesday as it happened to me but I work from home on Mondays so cannot comment on Monday. They were checking the tickets in front of the barriers rather than step aside and let us go through. One person was getting a fine so it
And I agree, those doors are not fit for purpose, it only really lets one person out at a time. I want to get through quickly as I get stressed in crowds and want to get out so I end up in the thick of it. I think I need to calm down and wait until the masses have got through and get less stressed and pathetic.
8 replies