Anyone know what's going on? Started a few weeks ago with a little generator that they had pumping away 24 hours a day. Now it seems to have escalated into lots of digging. New Hertford by-pass? [:)]
Reply ID 66083
Sainsbury's Tunnel
Reply ID 66085
Recent flooding in Chambers street. [?]
Reply ID 66093
I heard this second hand (so I can't vouch for its accuracy). It seems that when they did the pile driving for the new flats the other side of the river from Walton Motors, that they drove into a storm drain and filled it with concrete. I really hope these works will now cure the flash flooding problems.
Reply ID 66094
quote:Thats sounds like a possible reason for works / cause of extra flooding. I wondered why if it wqas for the flooding which seemed likely it was that side of the road but that would explain it the water I guess is flowing over the bridge and down into Chambers Street. Must ask Les Livings he is bound to know!!
Originally posted by Ray_by_the_Beane
I heard this second hand (so I can't vouch for its accuracy). It seems that when they did the pile driving for the new flats the other side of the river from Walton Motors, that they drove into a storm drain and filled it with concrete. I really hope these works will now cure the flash flooding problems.
Reply ID 66128
quote:They also destroyed a wonderful array of Clematis plants along the fence which I believe were planted by the Civic Society in the eighties.
Originally posted by Ray_by_the_Beane
I heard this second hand (so I can't vouch for its accuracy). It seems that when they did the pile driving for the new flats the other side of the river from Walton Motors, that they drove into a storm drain and filled it with concrete. I really hope these works will now cure the flash flooding problems.
Reply ID 66170
Hi. I actually live in one of the new flats opposite Walton Motors and you are quite right. We received a letter from Thames Water that the lunatics who built this place mucked up the drainage or sewers and filled them with concrete, hence the flooding in other areas of Hertford. The building works are expected to last until the end of September. Whilst some of the plants may have been pulled off of the fences please rest assured that there is still a lot left further away from the bridge and it is a haven for lots of birds.
Reply ID 66198
quote:Thanks for the definitive word. Here's looking forward to the completion of the works.
Originally posted by manaton
Hi. I actually live in one of the new flats opposite Walton Motors and you are quite right. We received a letter from Thames Water that the lunatics who built this place mucked up the drainage or sewers and filled them with concrete, hence the flooding in other areas of Hertford. The building works are expected to last until the end of September. Whilst some of the plants may have been pulled off of the fences please rest assured that there is still a lot left further away from the bridge and it is a haven for lots of birds.
Reply ID 66199
Phase 4 were the developers. I would hope that the water company and insurers would be seeking to recover their costs.
Reply ID 66235
Phase 4 still list the St Andrews rectory on their site under 'future developments' but that's obviously no longer the case, unless they've rebranded themselves.
Reply ID 66411
Will they still be there next week, when the schools go back? Should be fun in the mornings...
Reply ID 66412
quote:awwww no... that truly was a lovely sight [:(]
Originally posted by Artyquote:They also destroyed a wonderful array of Clematis plants along the fence which I believe were planted by the Civic Society in the eighties.
Originally posted by Ray_by_the_Beane
I heard this second hand (so I can't vouch for its accuracy). It seems that when they did the pile driving for the new flats the other side of the river from Walton Motors, that they drove into a storm drain and filled it with concrete. I really hope these works will now cure the flash flooding problems.
Reply ID 66959
Thanks for the information - As a new Bengeo resident I've been wondering what's going on there - and why nothing seems to be happening.
Reply ID 66961
Thankfully it is all completed now, no noise, no inconvenience. How pleasant. Those coming from Bengeo must have found it a nightmare in the mornings, especially just as the schools started back
Reply ID 66970
quote:It's been replaced now, noise wise, by a loudly clattering piece of road ironwork where Chambers Street meets Cowbridge[:(]
Originally posted by mikol
Thankfully it is all completed now, no noise, no inconvenience. How pleasant. Those coming from Bengeo must have found it a nightmare in the mornings, especially just as the schools started back
Reply ID 66972
quote:I have now logged this on the Herts County Council Highway Fault Reporting Web site.
Originally posted by Ray_by_the_Beanequote:It's been replaced now, noise wise, by a loudly clattering piece of road ironwork where Chambers Street meets Cowbridge[:(]
Originally posted by mikol
Thankfully it is all completed now, no noise, no inconvenience. How pleasant. Those coming from Bengeo must have found it a nightmare in the mornings, especially just as the schools started back
Reply ID 66973
Ah yes, I know what you mean! That and the noise of flatbed lorries driving over the bridge with loose tools in the back. So glad I discovered this forum to relieve my stress. Regarding the roadworks, does anyone here live near where the roadworks were? the generator/pump was a nightmare 24hours a day.