Can anyone please explain how they got the concrete balancing weights onto the crane hovering over Old Cross? Cheers.
0 replies
Archived Replies
Reply ID 20475
04/07/2006 by Sargasso
Using another crane maybe?
Reply ID 20479
04/07/2006 by The Informer
Thanks for that, interesting, not sure it explains how the concrete is hoisted but fascinating article all the same.
Reply ID 20485
04/07/2006 by Marilyn
quote:
Originally posted by The Informer
Thanks for that, interesting, not sure it explains how the concrete is hoisted but fascinating article all the same.
Odd I wondered the same thing this morning..........
Reply ID 20494
04/07/2006 by Ewoowar
I've watched it done before. They use a big mobile crane. I need to get out more.
Reply ID 20500
04/07/2006 by nora batty
Does the operator have to get out during a lightning storm?
Reply ID 20503
05/07/2006 by Steve
quote:
Originally posted by nora batty
Does the operator have to get out during a lightning storm?
Don't think so. The crane in Mill Road was manned during the thunder and lightning this afternoon. I would guess that Health and Safety regulations dictate that they are not connected to "ground"
Reply ID 20511
05/07/2006 by Frenchie
They have to get out in high winds though - which often accompany lightning